garment production cost calculation
Garment Production Cost Calculation Guide
Accurate garment costing improves pricing, negotiation, and profitability control.
Bangladesh-focused guide with practical calculation workflow.
Step-by-Step Explanation
- Calculate material consumption cost
- Add direct labor cost
- Add overhead and wastage allowance
Formula Used
- Unit production cost = material + labor + overhead + wastage adjustment
Example Calculation
- Material 110 + labor 22 + overhead 18 + wastage 5 = BDT 155 per piece.
Common Mistakes
- Ignoring trim/wastage
- Not updating cost for currency or utility change
FAQ
- Should CM be separate from FOB costing? Yes.
- How often should costing be updated? Every major price change.
Related Calculators
- Open: /calculators/cost-per-unit-calculator
- Open: /calculators/product-pricing-calculator
- Open: /calculators/profit-margin-calculator